Glavanizing Casting Formwork Rapid Clamp for Building Construction

Product Details
Customization: Available
Connection Type: Clamp Connection
Finish: Galvanized
Gold Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000
  • Glavanizing Casting Formwork Rapid Clamp for Building Construction
  • Glavanizing Casting Formwork Rapid Clamp for Building Construction
  • Glavanizing Casting Formwork Rapid Clamp for Building Construction
  • Glavanizing Casting Formwork Rapid Clamp for Building Construction
Find Similar Products

Basic Info.

Model NO.
SP08431
Type
Tie Rod Part
Item Name
Wedge Clamp
Weight
0.42/0.5kgs
Sample
Free
Delivery Date
25-30
Color
Black, Silver, Yellow
Certification
CCC, CE, ISO
After-Sales Service
12 Months
Warranty
12 Months
Application
Concorete Formwork
Surface Treatment
Natural, Electro Galvanized, HDG
Technics
Castig
Transport Package
Wooden Case
Specification
20mm/30mm/50mm/60mm/100mm/120mm Etc
Trademark
SP
Origin
China
HS Code
8486909000
Production Capacity
80, 000 PCS Monthly

Product Description

 
We are specialized in construction formwork accessories and fasteners, such as wedge bolt, anchor bolt, al pin, standard pin, flat head pin, rib wahser, steel tie rod, tie nut, form tie, b cone, d cone, scaffolding couplers, u clip, full wall tie, nominal wall tie and pipe hook and so on.

 

Product Details

 

Product information rapid clamp
Type Right-angle coupler, swivel coupler, connecting coupler
Materials Q235/Q345/Ductioe iron
Standard EN74/BS1139/SGS/CE/ISO9001:2000
Dimensions 48.3x48.3mm/48.3x60.3mm/48.3x76.3mm
Nut size 17/19/21/22/23mm
Strength of T bolts Class 4.8/6.8/8.8
Surface Treatment Cold galvanized, Hot dip galvanized, Painted, Powder coated
Appearance color red paint, blue paint, yellow paint, green paint, bright galvanized
Standard weight 0.85kg, 0.9kg,1kg,1.1kg,1.2kg
Feature High Breaking Strength/Durable/Easy to Assemble and Dismantle
Packing 25 pcs/woven bags
Payment term By T/T or L/C
Delivery time 25 days upon the Confirmed Contract

 

Glavanizing Casting Formwork Rapid Clamp for Building Construction
Glavanizing Casting Formwork Rapid Clamp for Building ConstructionGlavanizing Casting Formwork Rapid Clamp for Building Construction
Glavanizing Casting Formwork Rapid Clamp for Building Construction
Glavanizing Casting Formwork Rapid Clamp for Building Construction

Glavanizing Casting Formwork Rapid Clamp for Building ConstructionGlavanizing Casting Formwork Rapid Clamp for Building ConstructionGlavanizing Casting Formwork Rapid Clamp for Building Construction
Glavanizing Casting Formwork Rapid Clamp for Building ConstructionGlavanizing Casting Formwork Rapid Clamp for Building Construction

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier